Painting

본문 바로가기
  • KO
Is there anything you would like to find?
Please enter a search term.
사이트 내 전체검색

Painting

PRIMER & PAINT (TOP COAT)

The final step that enhances perfection, the technology that coats trust.

The painting process (Primer & Paint) is the final finishing step for surface-treated parts to protect their appearance and ensure corrosion resistance.

Korea Surface Treatment Co., Ltd. is equipped with spray booths and drying ovens for a wide range of tasks, from large to small sizes, and performs painting work for domestic and international aerospace and defense components, including those for Boeing and Airbus.

Process

Division Description Note
Primer Apply to topcoat or internal parts Thorough management of temperature, humidity, and dust
Paint / Top Coat Applied to the exterior final surface (very high customer requirements)

Major Facilities

Item Specification Note
Spray Booth
Large
  • 13m(L) X 4.0m(W) X 4.7m(H)
  • Temp/Humidity Requirements: 15~32℃, 20~80%
  • Large/Heavy item monorail (1-row) system
    Load: 1 Ton, Travel: Manual Wheel Type
Medium
  • 11.5m(L) X 6.5m(W) X 4.0m(H)
  • Temp/Humidity Requirements: 15~32℃, 20~80%
Top Coating
  • 4m(L) X 6m(W) X 2.8m(H)
  • Temp/Humidity Requirements: 15~32℃, 20~80%
  • Wet type: Double-sided Water Overflow
Dry Room
Large
  • 13m(L) X 5.0m(W) X 4.7m(H)
  • Drying temp: Max 90℃
  • Large/Heavy item monorail (3-row) system
Medium
  • 11.5m(L) X 7.4m(W) X 3.0m(H)
  • Drying temp: Max 90℃
Top Coating
  • 8m(L) X 7.5m(W) X 2.8m(H)
  • Drying temp: Max 80℃, Operating temp: 70℃